SmartS (Florida)
Posts: 49
Posts: 49
Posted:
Referring to:
720;3035 "1) The authority of an association or any architectural, construction improvement, or other such similar committee of an association to review and approve plans and specifications for the location, size, type, or appearance of any structure or other improvement on a parcel, or to enforce standards for the external appearance of any structure or improvement located on a parcel, shall be permitted only to the extent that the authority is specifically stated or reasonably inferred as to such location, size, type, or appearance in the declaration of covenants or other published guidelines and standards authorized by the declaration of covenants.
Many items are not spelled out in the docs so this paragraph is always used for denial. It is from docs prepared in 1992. For example there are no specific paint colors.
Here is the DOC language:
"THEREFORE, the Developer has appointed an Architectural Review Committee (ARC) comprised of a combination of property
owners and paid professional consultants to evaluate proposed improvements with emphasis upon their harmonious incorporation·
into the community as a whole and with specific emphasis on external design, location of the improvement in relation to the
surrounding structures and landscape and/or improvements, topography, and conformity with the restrictive covenants,
criteria and procedures imposed by SEASIDE. The ARC shall, at its sole discretion, judge the adequacy of plans submitted and
may reject any proposed construction or alteration or development for any reason including purely aesthetic reasons provided
however that approval of plans shall not be unreasonably withheld."
The BOARD ARC simply uses "harmony" to deny anything they want. What can be inferred from that language?
PS Developer is gone and Homeowners running the HOA BOD and ARC (same members) small development less than 20 homes.
720;3035 "1) The authority of an association or any architectural, construction improvement, or other such similar committee of an association to review and approve plans and specifications for the location, size, type, or appearance of any structure or other improvement on a parcel, or to enforce standards for the external appearance of any structure or improvement located on a parcel, shall be permitted only to the extent that the authority is specifically stated or reasonably inferred as to such location, size, type, or appearance in the declaration of covenants or other published guidelines and standards authorized by the declaration of covenants.
Many items are not spelled out in the docs so this paragraph is always used for denial. It is from docs prepared in 1992. For example there are no specific paint colors.
Here is the DOC language:
"THEREFORE, the Developer has appointed an Architectural Review Committee (ARC) comprised of a combination of property
owners and paid professional consultants to evaluate proposed improvements with emphasis upon their harmonious incorporation·
into the community as a whole and with specific emphasis on external design, location of the improvement in relation to the
surrounding structures and landscape and/or improvements, topography, and conformity with the restrictive covenants,
criteria and procedures imposed by SEASIDE. The ARC shall, at its sole discretion, judge the adequacy of plans submitted and
may reject any proposed construction or alteration or development for any reason including purely aesthetic reasons provided
however that approval of plans shall not be unreasonably withheld."
The BOARD ARC simply uses "harmony" to deny anything they want. What can be inferred from that language?
PS Developer is gone and Homeowners running the HOA BOD and ARC (same members) small development less than 20 homes.