DeeS1 (Michigan)
Posts: 223
Posts: 223
Posted:
We are having some erosion issues with our storm water basins. Is anyone familiar with how the development process works? Our developer went bankrupt prior to the subdivision being completed and the community was never actually properly transitioned to the HOA.
We are wondering if what we have in place is "as designed/approved" or if it might never have actually been finished. As the storm sewer and basins are created, do they typically get inspected by city officials or is it simply assumed that they are designed to the approved plans? Anyone know?
I have the engineering drawings, but can't tell if there's an inspection process too?
We are wondering if what we have in place is "as designed/approved" or if it might never have actually been finished. As the storm sewer and basins are created, do they typically get inspected by city officials or is it simply assumed that they are designed to the approved plans? Anyone know?
I have the engineering drawings, but can't tell if there's an inspection process too?